It's my understanding the Mustang plant will be shut down for 2 weeks real soon. Does anybody know if our cars on the infamous Ramp 51 will be shut down too? Or will the quality control checks they are supposedly doing continue? Obviously I am hoping our cars aren't part of the plant shutdown and if by chance they are truly in-transit, they will continue moving, if at a snail's pace.

Thanks!

2011 Race Red GT Prem Conv 6 sp. scoop and spoiler. Ordered 5/7, ETA 6/20, 6/25, now on Ramp 51 no new updates. Car is apparently lost and cannot be found...
 

· Registered
Joined
·
2,755 Posts
It's my understanding the Mustang plant will be shut down for 2 weeks real soon. Does anybody know if our cars on the infamous Ramp 51 will be shut down too? Or will the quality control checks they are supposedly doing continue? Obviously I am hoping our cars aren't part of the plant shutdown and if by chance they are truly in-transit, they will continue moving, if at a snail's pace.

Thanks!

2011 Race Red GT Prem Conv 6 sp. scoop and spoiler. Ordered 5/7, ETA 6/20, 6/25, now on Ramp 51 no new updates. Car is apparently lost and cannot be found...
Rut roaw. Are we talking re-working the ramp 51 cars and a factory recall of the ones already delivered?
 

· Registered
Joined
·
312 Posts
Last I heard, shut down is production line only for changeover to 2nd run. Supposed to keep shipping what has already been built. But, with the mounting pile of lies from Ford, who knows.
 

· Registered
Joined
·
2,755 Posts
So the v6 w performance pack starts production and a few bugs are being worked out (no doubt) from initial run. What other changes?
 

· Dragon Tail Master
2013 Mustang V6 Brembo
Joined
·
2,755 Posts

· Registered
Joined
·
21 Posts
The plant was closed last week and this week. Production begins again next week, though this is NOT Job 2. Job 2 starts Aug. 16th.

Prior to the break, there were two shifts building cars, now there will only be one, running 40% faster than before.
 

· Registered
Joined
·
189 Posts
The plant was closed last week and this week. Production begins again next week, though this is NOT Job 2. Job 2 starts Aug. 16th.

Prior to the break, there were two shifts building cars, now there will only be one, running 40% faster than before.
So is the factory starting up again on Tuesday July 6th or Monday July 12th?
 